img
No Internet
SWIPE TO GO BACK
TRIP
POSITION
INFO
PORT CALLS
VISITED PORTS
LAST TRIPS
EVENTS
WEATHER
Upload Photo
Type
IMO ---
MMSI 368276670
Flag
Flag USA
Call Sign WDN3963
Size 6 x 20 m
GT ---
DWT ---
Build ---
Status Active
Owner

Current Trip

Flag VGJVD
ATD
2025-11-09 20:26 (UTC)
32 days ago

Unknown

Destination Port
ETA*
---
Time Travelled 32 days
Remaining Time ---
Distance Travelled 184.88 nm
Remaining Distance ---
AVG Speed 14.1 Knots
MAX Speed 23.8 Knots
AVG Wind 8.9 knots
MAX Wind 18 knots
MIN Temp 24°C / 75.2°F
MAX Temp 28.3°C / 82.94°F
Draught ---
Position Received 8 d ago

Current Position

Longitude ---
Latitude ---
Status Default
Speed 9 Knots
Course 294.5°
Area North Atlantic Ocean
Station T-AIS
Position Received 8 d ago

Info

info

Information

The current position of CHANGE ORDER is in North Atlantic Ocean with coordinates 18.59298° / -65.68114° as reported on 2025-12-03 17:12 by AIS to our vessel tracker app. The vessel's current speed is 9 Knots

The vessel CHANGE ORDER (MMSI: 368276670) is a Pleasure Craft It's sailing under the flag of [US] USA.

In this page you can find informations about the vessels current position, last detected port calls, and current voyage information. If the vessels is not in coverage by AIS you will find the latest position.

The current position of CHANGE ORDER is detected by our AIS receivers and we are not responsible for the reliability of the data. The last position was recorded while the vessel was in Coverage by the Ais receivers of our vessel tracking app.

Weather

Temperature 27.6°C / 81.68°F
Wind Speed 9 knots
Direction 120° ESE
Pressure 1013.9 hPa
Humidity 70 %
Cloud Coverage 17 %

Featured Company

Last Port Calls

Port Arrival Departure Time In Port
Flag JOST VAN DYKE 2025-11-07 15:20 2025-11-09 20:26 2 d
Show More

Most Visited Ports (Last year)

Port Arrivals
Flag JOST VAN DYKE 3
Flag CULEBRA 2
Flag ROAD TOWN 1
Flag CRUZ BAY 1

Last Trips

Origin Departure Destination Arrival Distance
Flag CULEBRA 2025-08-15 11:24 Flag JOST VAN DYKE 2025-11-07 11:20 93.59 nm

Events

Time Event Details Position / Dest Info
2025-12-03 17:12 OUT of Coverage
18.59298 / -65.68114
North Atlantic Ocean
Speed: 9 kn
Course: 294.5°
2025-12-03 15:55 Change Sea Area Puerto Rican part of the North Atlantic Ocean
Puerto Rican part of the Caribbean Sea
18.56930 / -65.62859
North Atlantic Ocean
Speed: 9 kn
Course: 246.5°
2025-12-03 13:36 IN Coverage
18.46900 / -65.55914
Caribbean Sea
Speed: 7.9 kn
Course: 116.8°
Show More