CHANGE ORDER
Pleasure Craft
Current Trip
Time Travelled | 46 days |
---|---|
Remaining Time | --- |
Distance Travelled | 48.33 nm |
Remaining Distance | --- |
AVG Speed | 18.3 Knopen |
MAX Speed | 21.3 Knopen |
AVG Wind | 7.9 knots |
MAX Wind | 9.6 knots |
MIN Temp | 27.2°C / 80.96°F |
MAX Temp | 28.6°C / 83.48°F |
Diepgang | --- |
Positie ontvangen | 4 d geleden |
Current Position
Lengtegraad | -65.63231° |
---|---|
Breedtegraat | 18.28735° |
Status | Default |
Snelheid | 0.3 Knopen |
Koers | --- |
Gebied | Caribbean Sea |
Station | T-AIS |
Positie ontvangen | 4 d geleden |
Info
Information
The current position of CHANGE ORDER is in Caribbean Sea with coordinates 18.28735° / -65.63231° as reported on 2024-05-11 22:06 by AIS to our vessel tracker app. The vessel's current speed is 0.3 Knopen
The vessel CHANGE ORDER (MMSI: 368276670) is a Pleasure Craft It's sailing under the flag of [US] USA.
In this page you can find informations about the vessels current position, last detected port calls, and current voyage information. If the vessels is not in coverage by AIS you will find the latest position.
The current position of CHANGE ORDER is detected by our AIS receivers and we are not responsible for the reliability of the data. The last position was recorded while the vessel was in Coverage by the Ais receivers of our vessel tracking app.
Weather
Temperature | 27.1°C / 80.78°F |
---|---|
Wind Speed | 4 knots |
Direction | 191° S |
Pressure | 1012.9 hPa |
Humidity | 78.4 % |
Cloud Coverage | 10 % |
Featured Company
Last Port Calls
Port | Arrival | Departure | Time In Port |
---|---|---|---|
NORMAN ISLAND | 2024-03-28 19:11 | 2024-03-30 14:37 | 1 d |
ROAD TOWN | 2024-03-28 18:25 | 2024-03-28 18:49 | 23 m |
Most Visited Ports (Last year)
Port | Arrivals | |
---|---|---|
FORT LAUDERDALE | 2 | |
PORT EVERGLADES | 1 | |
NORMAN ISLAND | 1 | |
ROAD TOWN | 1 |
Last Trips
Origin | Departure | Destination | Arrival | Distance | |
---|---|---|---|---|---|
ROAD TOWN | 2024-03-28 14:49 | NORMAN ISLAND | 2024-03-28 15:11 | 6.02 nm | |
ROAD TOWN | 2024-03-28 14:49 | ROAD TOWN | 2024-03-28 14:25 | 6.02 nm |
Events
Tijd | Evenement | Details | Positie / Bestemming | Info |
---|---|---|---|---|
2024-05-11 22:06 | Buitenbereik |
18.28735 / -65.63231
Caribbean Sea
|
Snelheid: 0.3 kn Koers: 263.5° |
|
2024-05-11 22:06 | Stop beweging | 2.95 nm, South of FAJARDO |
18.28735 / -65.63231
|
Snelheid: 0.3 kn Koers: 511° |
2024-05-11 20:47 | Binnenbereik |
18.32883 / -65.23795
Caribbean Sea
|
Snelheid: 20.5 kn Koers: 279.9° |
|
2024-05-11 14:39 | Buitenbereik |
18.32246 / -65.23048
Caribbean Sea
|
Snelheid: 8.1 kn Koers: 151.5° |
|
2024-05-11 13:22 | Binnenbereik |
18.29069 / -65.62993
Caribbean Sea
|
Snelheid: 9.9 kn Koers: 83.3° |