CHANGE ORDER
Pleasure Craft
Current Trip
Time Travelled | 29 days |
---|---|
Remaining Time | --- |
Distance Travelled | 63.77 nm |
Remaining Distance | --- |
AVG Speed | 18.9 Knop |
MAX Speed | 23.2 Knop |
AVG Wind | 11.4 knots |
MAX Wind | 14 knots |
MIN Temp | 25.4°C / 77.72°F |
MAX Temp | 27.3°C / 81.14°F |
Djupgående | --- |
Position mottagen | 1 d sen |
Current Position
Longitud | -65.63237° |
---|---|
Latitude | 18.28737° |
Status | Default |
Fart | |
Kurs | --- |
Område | Caribbean Sea |
Station | T-AIS |
Position mottagen | 1 d sen |
Info
Information
The current position of CHANGE ORDER is in Caribbean Sea with coordinates 18.28737° / -65.63237° as reported on 2024-04-27 17:28 by AIS to our vessel tracker app. The vessel's current speed is 0 Knop
The vessel CHANGE ORDER (MMSI: 368276670) is a Pleasure Craft It's sailing under the flag of [US] USA.
In this page you can find informations about the vessels current position, last detected port calls, and current voyage information. If the vessels is not in coverage by AIS you will find the latest position.
The current position of CHANGE ORDER is detected by our AIS receivers and we are not responsible for the reliability of the data. The last position was recorded while the vessel was in Coverage by the Ais receivers of our vessel tracking app.
Weather
Temperature | 27.4°C / 81.32°F |
---|---|
Wind Speed | 8 knots |
Direction | 74° ENE |
Pressure | 1014.3 hPa |
Humidity | 71.4 % |
Cloud Coverage | 100 % |
Featured Company
Last Port Calls
Port | Arrival | Departure | Time In Port |
---|---|---|---|
NORMAN ISLAND | 2024-03-28 19:11 | 2024-03-30 14:37 | 1 d |
ROAD TOWN | 2024-03-28 18:25 | 2024-03-28 18:49 | 23 m |
FORT LAUDERDALE | 2024-02-29 22:43 | ||
PORT EVERGLADES | 2024-02-29 22:30 | 2024-02-29 22:37 | 7 m |
FORT LAUDERDALE | 2024-02-26 18:14 | 2024-02-29 22:25 | 3 d |
PALM BEACH | 2024-02-26 15:51 |
Most Visited Ports (Last year)
Port | Arrivals | |
---|---|---|
FORT LAUDERDALE | 2 | |
ROAD TOWN | 1 | |
PORT EVERGLADES | 1 | |
NORMAN ISLAND | 1 |
Last Trips
Origin | Departure | Destination | Arrival | Distance | |
---|---|---|---|---|---|
ROAD TOWN | 2024-03-28 14:49 | NORMAN ISLAND | 2024-03-28 15:11 | 6.02 nm | |
ROAD TOWN | 2024-03-28 14:49 | ROAD TOWN | 2024-03-28 14:25 | 6.02 nm | |
PORT EVERGLADES | 2024-02-29 17:37 | FORT LAUDERDALE | 2024-02-29 17:43 | 0.78 nm | |
FORT LAUDERDALE | 2024-02-29 17:25 | PORT EVERGLADES | 2024-02-29 17:30 | 0.41 nm | |
PALM BEACH | 2024-02-26 10:51 | FORT LAUDERDALE | 2024-02-26 13:14 | 33.28 nm |
Events
Tid | Event | Detaljer | Position / Dest | Information |
---|---|---|---|---|
2024-04-27 17:28 | UTANFÖR täckningsområde |
18.28737 / -65.63237
Caribbean Sea
|
Fart: Kurs: 511° |
|
2024-04-27 12:34 | I täckningsområde |
18.28734 / -65.63239
Caribbean Sea
|
Fart: Kurs: 511° |
|
2024-04-26 17:46 | UTANFÖR täckningsområde |
18.28735 / -65.63238
Caribbean Sea
|
Fart: Kurs: 511° |
|
2024-04-26 16:55 | I täckningsområde |
18.28735 / -65.63238
Caribbean Sea
|
Fart: Kurs: 511° |
|
2024-04-25 15:07 | UTANFÖR täckningsområde |
18.28734 / -65.63236
Caribbean Sea
|
Fart: Kurs: 511° |
|
2024-04-24 22:07 | I täckningsområde |
18.28732 / -65.63237
Caribbean Sea
|
Fart: Kurs: 511° |
|
2024-04-24 20:52 | UTANFÖR täckningsområde |
18.28735 / -65.63237
Caribbean Sea
|
Fart: Kurs: 511° |
|
2024-04-23 23:37 | I täckningsområde |
18.28731 / -65.63238
Caribbean Sea
|
Fart: Kurs: 511° |
|
2024-04-23 21:49 | UTANFÖR täckningsområde |
18.28738 / -65.63238
Caribbean Sea
|
Fart: Kurs: 511° |
|
2024-04-23 21:13 | I täckningsområde |
18.28739 / -65.63238
Caribbean Sea
|
Fart: Kurs: 511° |